I called them because I needed an engineering company to work with me on a concrete garage foundation I was having poured at my home. They showed up on time and inspected the project / area to...
Arredondo Group
(8)
Advertisement
Photos
Reviews
Getting the tech to come out to assess what was needed was easy. Estimate and scope if work was promised within 48 hours. I wanted one week then called. Promised again in 2 days. Called again...
Arredondo levelled my house to within 0.2 inches of being out of specification and the buyer noticed it. Then when I went back to Arredondo they provided me a quote for over $5000 additional cost...
Arredondo is a horrible and irresponsible company. Try to get away from this company as fast as possible. Here is the event timeline why I drew this conclusion. I bought a property which is close...
I had my house leveled in May 2007. Due to a prolonged drought then getting double our yearly rainfall average this year, our house settled on one end. I dreaded calling for warranty work because...
You might also like
Partial Data by Infogroup (c) 2025. All rights reserved.
Partial Data by Foursquare.
Advertisement
